    Hart High School – Phase I

    Rend-final-06_large

    In April 2007, the William S Hart Union High School District approached Flewelling & Moody with the need to modernise their flagship campus.  Hart High School's facilities date to the early 1950s, and other than a gymnasium built following the Northridge earthquake in 1994, the site had not seen modernization, and had not seen significant new construction since the mid 1970s.

    In extensive consultations with District and site administration, instructional staff and our consultants, Phase I of the project developed into a modernization of 7 of the classroom buildings onsite, provision of a new 7-lab Modular Science building, a Band Room Addition to the Auditorium, site-wide fire alarm, new restrooms and extensive IT infrastructure upgrades.

    Wherever possible, daylighting was provided to classrooms, using high clerestory windows and solatube skylights.  Nora rubber flooring and Interface carpet tile provided the opportunity for coordinating floor patterns in classrooms and hallways.  Thin brick on the bandroom addition was produced using the same equipment as the brick original to the 1950 Auditorium, enabling a precise match between old and new structures.  Perhaps the most gratifying aspect of the project is the pride the students, staff and community take in the new spaces.

    Project Role: Job Captain/Architect & Construction Administration Lead.

     

    Overall Site Rendering: Flewelling & Moody

     

    Design Update Presentation

     

    Above: Hart Auditorium - Choral room and New Band room Addition.  The tooling used to form the original ruffled brick texture was used 60 years later to create a matching thin brick application, resulting in an almost seamless blending of the addition into the context.

    Image Credits: Weldon Brewster / / Flewelling & Moody 

    Click here to download:
    Kezar-Hart-Wenger-Photos.pdf (2.91 MB)

    Image Credits: Mitch Kezar / / Flewelling & Moody 


    Above: Hart Classroom Modernizations - Chemistry, Physics, Foods, Ceramics, Computer Lab, Math/English

    Image Credits: Weldon Brewster / Flewelling & Moody

     

    Above: Portion II - Modular Science Building
    Image Credits: Weldon Brewster / Flewelling & Moody

     

    Above: Modular Science Building Time Lapse Video

    Design, factory fabrication, & on-site construction.

     

    Tags » Portfolio
    • 1 December 2012
    • Views
    • Permalink
    • Favorited 0 Times
    • Tweet
  • Mark J. Hulme's Posterous

    Contributed by Mark Hulme, AIA, LEED AP BD+C

    • Contributors
    • Mark Hulme, AIA, LEED AP BD+C
  • About Mark J. Hulme

    California Architect License (C32413).  At my current employer, I work to integrate BIM tools and sustainable design strategies into the architectural projects I design and see through construction.  An inveterate technophile, I am an advocate for open source tech anywhere it makes business sense to suggest it.

    I have a deep love of architecture and want to see its vision expanded, its processes improved and its stature regained.

    Subscribe

    Subscribe to this posterous
    Unsubscribe
    Follow this posterous RSS
    You're a contributor here (Edit)
    This is your Space (Edit)
    Follow by email »
    Get the latest updates in your email box automatically.
  • Recommended

    • Basecamp: Project management and collaboration.
    • Backpack: Intranet, group calendar, small business organizer
    • Highrise: Small business CRM, Web-based contact manager
    • Freshbooks: Simple time-tracking & invoicing
    • 1 & 1: Reliable inexpensive domain names.

    More Info

    • Twitter
    • Bookmarks
    • LinkedIn
    • Flickr
    • Architizer
    • Goodreads
  • Tweets

Theme created for Posterous by Obox